- Internal access 2 car garage
- 2 new wings to the upstairs area which including; 2 ensuites, 3 bedrooms, 1 office.
- New 2nd story deck spanning the length of the house along with 2 smaller 2nd story balconies on the other side of the house.
- New ground floor deck
- Full renovation of the interior, with polished Rimu floor, new heated polished concrete floor in the lounge, and bathroom refits.
First Floor Balcony
First Floor Balcony
Dining Room
New bi-fold doors and wall move to open up a well used living area.
Living Room
Lounge renovation with polished/heated concrete floor.
Spiral Staircase
Spiral American Oak Staircase
Home entrance lobby with American Oak staircase and polished concrete floor.
Master Ensuite
Floor to ceiling tiles with bidet, bath, shower, vanity and toilet.
2nd Living Area