Bathroom Renovation

A shower leak sparked the transformation of this bathroom, leading to a complete renovation. We removed the retro-fitted bathroom, which had lasted 30 years since its last update.

With 75% of the space sitting on a floating floor, we lowered it and re-routed the plumbing beneath the concrete slab, creating a more open and spacious layout.

Wall-hung vanity with an inset mirror cabinet and built-in demister.

Wall-hung vanity with an inset mirror cabinet and built-in demister.

Toilet with in-wall cistern.

Toilet with in-wall cistern.

Wall hung vanity, with Methven hardware

Wall hung vanity, with Methven hardware

Atlantis shower with Methven hardware

Atlantis shower with Methven hardware